05 December — 07 December |
||
Delays likely Traffic control (multi-way signals) |
||
Works location: At the junction with BOTTLE LANE on READING ROAD |
||
Works description: TURGIS GREEN 22 - DSLAM 598068 - BLOCKAGES – Excavate onto BT ducts for the clearance of duct blockages in CW/verge to facilitate spine cabling works. |
||
Responsibility for works: Openreach |
||
Current status: Advanced planning |
||
Works reference: BC006MU1WSEP00IBWNA4LK01 |
03 December — 07 December |
||
Delays possible Traffic control (multi-way signals) |
||
Works location: Junction of Cufaude Lane to Opposite and to O/S Pippin House |
||
Works description: Excavate F/W and C/W to install new GTC network including Chambers and Cabs |
||
Responsibility for works: INDEPENDENT FIBRE NETWORKS |
||
Current status: Advanced planning |
||
Works reference: UX00118GTC203 |