30 November — 04 December |
||
Delays possible Traffic control (Stop/Go boards) |
||
Works location: APRX 13M SE FROM JUNCTION BRAMLEY LANE ON OLIVERS LANE |
||
Works description: TO15 - TURGIS GREEN - 584512 - To build new joint box in verge |
||
Responsibility for works: Openreach |
||
Current status: Planned work about to start |
||
Works reference: BC006MU1WSEP00IBWD0NRA02 |
30 November — 04 December |
||
Delays possible Traffic control (two-way signals) |
||
Works location: Approx 285m NE from the junction of OLIVERS LANE heading 285m further NE on STRATFIELD SAYE ROAD |
||
Works description: TURGIS GREEN 21 - DSLAM 597989 - BLOCKAGES – Excavate onto BT ducts for the clearance of duct blockages in Verge/CW to facilitate spine cabling works. |
||
Responsibility for works: Openreach |
||
Current status: Planned work about to start |
||
Works reference: BC005MU1WSEP00IBWN82TH01 |