|
06 February — 15 February |
||
|
Delays possible Traffic control (two-way signals) |
||
|
Works location: LITTLE LONDON NURSERIES,BRAMLEY ROAD,LITTLE LONDON,TADLEY,HAMPSHIRE,RG26 5EY |
||
|
Works description: 1 X NEW WATER SUPPLY TO NEW PROPERTY. EXCAVATION SHOULD BE 6M OF CARRIAGEWAY |
||
|
Responsibility for works: South East Water |
||
|
Current status: Advanced planning |
||
|
Works reference: EB00519862684 |
||
|
05 February — 07 February |
||
|
Delays possible Traffic control (two-way signals) |
||
|
Works location: OS GREEN FARM SHERFIELD ROAD BRAMLEY GREEN RG26 5BB. |
||
|
Works description: Access to Underground structure - cabling to restore customer service. |
||
|
Responsibility for works: Openreach |
||
|
Current status: Planned work about to start |
||
|
Works reference: BC005CB1W00000IBYA4RVRRG |
||
|
04 February — 12 February |
||
|
Delays unlikely Some carriageway incursion |
||
|
Works location: O/S 3 |
||
|
Works description: Excavate and carry out connection of new gas main to existing as works were not previously completed |
||
|
Responsibility for works: GAS TRANSPORTATION CO LTD |
||
|
Current status: Planned work about to start |
||
|
Works reference: ZP012TRI/X371/003 |
||
|
06 February — 08 February |
||
|
Delays unlikely Traffic control (give & take) |
||
|
Works location: BOTHY COTTAGE,LONGBRIDGE ROAD,BRAMLEY,TADLEY,HAMPSHIRE,RG26 5AN |
||
|
Works description: To Perm Reinstate |
||
|
Responsibility for works: South East Water |
||
|
Current status: Planned work about to start |
||
|
Works reference: EB005-18089815 |
||