Roadworks Update: 29th April 2019

Bramley Road, Pamber End, Hampshire

29 April — 30 April

   

Delays likely Road closure

 

Works location: Aldrmaston Road (A340) - Silchester Road

   

Works description: SD-HR19124 Bramley Road, Pamber End - Surface treatment programme

   

Responsibility for works: Hampshire

   

Current status: Planned work about to start

   

Works reference: FF402SD-HR19124/ST

   

 

Bramley Road, Sherfield-on-loddon, Hampshire

30 April — 02 May

   

Delays possible Traffic control (two-way signals)

 

Works location: Bramley Road, Sherfield-on-Loddon. On footway near number 8.

   

Works description: Wooden Bollard Knocked Down. Take up and dispose of existing base and replace with new Broxap BX17 Flat Top Square Timber Bollard 150mm x 150mm in Width & Length and 1000mm total height, with Half Red/Half White Rebate and Reflective Band. (Non-ill Sign/blld miss/dmged)

   

Responsibility for works: Hampshire

   

Current status: Advanced planning

   

Works reference: FF402110656731901141310

   

 

Campbell Road, Bramley, Hampshire

30 April — 02 May

   

Delays possible Traffic control (two-way signals)

 

Works location: Campbell Road, Bramley. In centre of carriageway between junctions for St Marys Avenue and Campbell Court.

   

Works description: Carriageway Pothole. 1m x 1m Type B carriageway patch required. (Carriageway pothole)

   

Responsibility for works: Hampshire

   

Current status: Advanced planning

   

Works reference: FF402110722121902281755 