01 July — 09 August |
||
Delays likely Road closure |
||
Works location: Olivers Lane - from Bramley Lane to Folly Lane |
||
Works description: Carriageway resurfacing, civil and lining works |
||
Responsibility for works: Hampshire |
||
Current status: Planned work about to start |
||
Works reference: FF110B509CWRS |
01 July — 05 July |
||
Delays possible Traffic control (multi-way signals) |
||
Works location: junction with SILCHESTER ROAD across BRAMLEY CORNER |
||
Works description: TURGIS GREEN 20 - DSLAM 577850 - POWER CONNECTION following street cabinet installation. Excavate to expose low voltage cable for Power Connection and lay approx 17m duct. POWER engineer to carry out inspection prior to jointing.POWER jointing team to insert cable and execute jointing works. Reinstate,Check and clear site. cw/verge |
||
Responsibility for works: Openreach |
||
Current status: Planned work about to start |
||
Works reference: BC005MU1WSEP00IBW9DDMY02 |