20 February — 20 February |
||
|
Delays likely Traffic control (two-way signals) |
||
|
Works location: TURGIS GREEN A33 BASINGSTOKE ROAD OPPOSITE THE BP STATATION ON GRASS VERGE |
||
|
Works description: Restricted working hours for 0930 to 1500 Monday to Friday. Missing M/H Cover and frame please replace with 600 x 600 m/h cover and frame Also dig out weir kerb and check working. . TM TWO WAY LIGHTS. |
||
|
Responsibility for works: Hampshire |
||
|
Current status: Advanced planning |
||
|
Works reference: FF402110714541901141502 |
||
|
20 February — 20 February |
||
|
Delays likely Traffic control (two-way signals) |
||
|
Works location: Outside Clovelly, A340 Aldermaston road, Pamber Green. |
||
|
Works description: Reposition 2x keep left arrows on existing post. Restricted hours of 0930-1600 apply. |
||
|
Responsibility for works: Hampshire |
||
|
Current status: Advanced planning |
||
|
Works reference: FF402110703381901141242 |
||
|
21 February — 25 February |
||
|
Delays possible Traffic control (two-way signals) |
||
|
Works location: LITTLE LONDON NURSERIES,BRAMLEY ROAD,LITTLE LONDON,TADLEY,HAMPSHIRE,RG26 5EY |
||
|
Works description: To perm reinstate |
||
|
Responsibility for works: South East Water |
||
|
Current status: Planned work about to start |
||
|
Works reference: EB00519862684 |
||
|
20 February — 20 February |
||
|
Delays possible Traffic control (two-way signals) |
||
|
Works location: Bramley Road, Sherfield-on-Loddon. On footway near number 8. |
||
|
Works description: Wooden Bollard Knocked Down. Take up and dispose of existing base and replace with new Broxap BX17 Flat Top Square Timber Bollard 150mm x 150mm in Width & Length and 1000mm total height, with Half Red/Half White Rebate and Reflective Band. (Non-ill Sign/blld miss/dmged) |
||
|
Responsibility for works: Hampshire |
||
|
Current status: Advanced planning |
||
|
Works reference: FF402110656731901141310 |
||