|
08 March — 08 March |
||
|
Delays possible Traffic control (two-way signals) |
||
|
Works location: Campbell Road, Bramley. In centre of carriageway between junctions for St Marys Avenue and Campbell Court. |
||
|
Works description: Carriageway Pothole. 1m x 1m Type B carriageway patch required. (Carriageway pothole) |
||
|
Responsibility for works: Hampshire |
||
|
Current status: Planned work about to start |
||
|
Works reference: FF402110722121902281755 |
||
|
08 March — 12 March |
||
|
Delays possible Traffic control (multi-way signals) |
||
|
Works location: GREEN PASTURES, COOPERS LANE, BRAMLEY, TADLEY, HAMPSHIRE, RG26 5DA |
||
|
Works description: To perm reinstate |
||
|
Responsibility for works: South East Water |
||
|
Current status: Planned work about to start |
||
|
Works reference: EB00519889719 |
||