20 May — 27 May |
||
|
Delays possible Traffic control (two-way signals) |
||
|
Works location: VECTIS |
||
|
Works description: SGN TO LAY NEW SERVICE FROM FS VERGE TO CONTINUE FURTHER INTO THE PRIVATE |
||
|
Responsibility for works: SGN |
||
|
Current status: Planned work about to start |
||
|
Works reference: XW040W116138834-03555 |
||