24 May — 28 May |
||
|
Delays possible Traffic control (Stop/Go boards) |
||
|
Works location: Approx. 200m from jct The Street. Cufaude Lane, Bramley. |
||
|
Works description: Fill verge overrun with type 1 stone and compact. (Verge overrun/damage/erosion) |
||
|
Responsibility for works: Hampshire |
||
|
Current status: Planned work about to start |
||
|
Works reference: FF402222027081905211252 |
||
|
24 May — 28 May |
||
|
Delays possible Traffic control (Stop/Go boards) |
||
|
Works location: Cufaude lane, Bramley. Two locations on attached plan. |
||
|
Works description: Gang to collect and bring to HCC store 2x Toad warning signs and A frames at loctions on attached plan. |
||
|
Responsibility for works: Hampshire |
||
|
Current status: Planned work about to start |
||
|
Works reference: FF402222038011905211246 |
||